Summary
THE PAPER INTRODUCES A TOTAL ENERGY SYSTEM UTILIZING A GAS ENGINE FOR A SPORTS ESTABLISHMENT COMPRISING AN ICE SKATING RINK, SWIMMING POOL, INDOOR GYMNASIUM, AND OFFICE. IN THIS SYSTEM, THE WASTE HEAT OF THE ICE SKATING RINK IN THE WINTER IS USED FOR THE HEATING AND HOT WATER SUPPLY OF EACH FACILITY. WHILE IN THE SUMMER, COOLING IS APPLIED TO EACH FACILITY AND THE WASTE HEAT IS USED TO HEAT THE SWIMMING POOL, POOL ROOM, AND TO SUPPLY HOT WATER FOR SHOWER.
Details
- Original title: [In Japanese. / En japonais.]
- Record ID : 1987-1979
- Languages: Japanese
- Source: Refrigeration - vol. 61 - n. 710
- Publication date: 1986
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (3)
See the source
Indexing
-
HEAT PUMPS, ENERGY COUPLING AND MULTIPLE USE OF...
- Author(s) : SAUNUS C., DUVENSTEDT A.
- Date : 1983
- Languages : German
- Source: Sanit. Heiz.tech., Spec. Ed. - vol. 48 - n. 3
View record
-
REFRIGERATION AND HEATING FOR SPORT AND LEISURE...
- Author(s) : ABEL H.
- Date : 1983
- Languages : French
- Source: Rev. tech. Sulzer - Sulzer tech. Rev. - vol. 65 - n. 4
View record
-
POMPE A CHALEUR A MOTEUR DIESEL : PERFORMANCES ...
- Author(s) : GAIGNOU A.
- Date : 1986/01
- Languages : French
View record
-
CAS DES INSTALLATIONS AVEC ENTRAINEMENT PAR MAC...
- Author(s) : ISALLY R.
- Date : 1981
- Languages : French
- Source: Rev. gén. Froid - vol. 71 - n. 6
View record
-
La primera instalación que se concibió en Españ...
- Date : 2002/04
- Languages : Spanish
- Source: Instalador - n. 385
View record