Requirements for smoking and air-conditioning plants of the future.
[In German. / En allemand.]
Type of article: Article
Summary
Among the requirements will be: smaller size; savings in staff, energy and operating costs; a perfect separation of "clean" and "dirty" sides; the ability to produce consistant quality; and a respect for the environment.
Details
- Original title: [In German. / En allemand.]
- Record ID : 1994-3074
- Languages: German
- Source: Fleischerei - vol. 44 - n. 12
- Publication date: 1993/12
- Document available for consultation in the library of the IIR headquarters only.
Links
See the source
Indexing
-
Themes:
Food engineering;
Specialized cold stores;
Meat and meat products - Keywords: Meat; Factory; Treatment; Design; Drying; Equipment; Smoking; Air conditioning
-
Dispatch at slaughter temperature as well: mode...
- Author(s) : HIRSCHBOLZ K. H.
- Date : 2011
- Languages : English
- Source: Fleischwirtschaft International - vol. 26 - n. 6
View record
-
Versand erfolgt auch schlachtwarm: moderner, ko...
- Author(s) : HIRSCHBOLZ K. H.
- Date : 2011
- Languages : German
- Source: Fleischwirtschaft - vol. 91 - n. 2
View record
-
Werkwijze en inrichting voor het koelen van sla...
- Date : 2004/10
- Languages : Dutch
- Source: Koude & Luchtbehandeling - vol. 97 - n. 9
View record
-
Effects of chilling on sampling of bacteria att...
- Author(s) : YU S. L., COOKE P. H., TU S. I.
- Date : 2001/03
- Languages : English
- Source: Lett. appl. Microbiol. - vol. 32 - n. 3
View record
-
Kwalitatief en energetisch verbeterd koelproces...
- Date : 1997/12
- Languages : Dutch
- Source: Koude & Luchtbehandeling - vol. 90 - n. 12
View record