They froze the Seine (well almost).
On a gelé la Seine.
Author(s) : VRINAT G.
Type of article: Article
Summary
In public works projects, sometimes the only solution is to freeze the ground. Liquid nitrogen or brine are chosen according to the scope and duration of the project. When the Metro tunnels under the Seine were built 100 years ago, the ground was frozen.
Details
- Original title: On a gelé la Seine.
- Record ID : 2001-2948
- Languages: French
- Source: Rev. gén. Froid - vol. 91 - n. 1015
- Publication date: 2001/07
- Document available for consultation in the library of the IIR headquarters only.
Links
See other articles in this issue (6)
See the source
Indexing
- Themes: Other industrial applications
- Keywords: France; Civil engineering; Metro; Ground; Freezing; Water
-
L'APPLICATION DE LA CONGELATION DU SOL AUX TRAV...
- Date : 1985
- Languages : French
- Source: Tunn. Ouvrages Souterr. - n. 69
View record
-
Tecniche di congelamento della Senna: important...
- Author(s) : VRINAT G.
- Date : 2006
- Languages : Italian
- Source: Industria & Formazione - vol. 30 - n. 5
- Formats : PDF
View record
-
Eiszeit im Münchner U-Bahn Tunnel.
- Author(s) : SELMER K.
- Date : 2005/11/16
- Languages : German
- Source: DKV-Tagungsbericht 2005, Würzburg./ 2005 Proceedings of the DKV Conference, Würzburg.
View record
-
A NEW MODEL OF FROST HEAVE PREDICTION FOR CLAYE...
- Author(s) : CHEN X. B., WANG Y. Q.
- Date : 1991/10
- Languages : English
- Source: Sci. China, B - vol. 34 - n. 10
View record
-
FREEZING HEAT TRANSFER WITHIN WATER-SATURATED P...
- Author(s) : SASAKI A., AIBA S., FUKUSAKO S.
- Date : 1990/05
- Languages : English
- Source: JSME int. J., Ser. II - vol. 33 - n. 2
View record