Summary
THE INSTALLATION HAS BEEN DESIGNED FOR THE AIR CONDITIONING OFA ROOM MEANT FOR THE CENTRAL DATA CARRIER. THE SURFACE FORESEEN IS 640 M2 AND THE CALORIFIC POWER EQUALS 800 W/M2. THE AIR CONDITIONING WAS REALIZED BY FIVE-CONDITIONING BOXES FED WITH CHILLED WATER AT 279 K (6 DEG C THE RECOVERED HEAT IS INJECTED IN THE HOT WATER NETWORK OF THE BATTERIES OF THE EJECTOR-CONVECTORS. ACCORDING TO THE CIRCUMSTANCES, DIFFERENT OPERATING SEQUENCES WITH DIFFERENT COMBINATIONS OF THERMODYNAMIC MACHINES ARE POSSIBLE. THE OPTIMUM CHOICE IS CALCULATED BY A CENTRAL MANAGEMENT COMPUTER.
Details
- Original title: DESIGN, REALIZATION AND EXPLOITATION OF AN INSTALLATION FOR THE RECOVERY OF THE HEAT RELEASED IN COMPUTER CENTER BY MEANS OF HEAT PUMPS AND INJECTION OF CALORIES IN THE HEATING NETWORK OF THE BUILDING.
- Record ID : 1987-1995
- Languages: English
- Subject: Environment
- Publication date: 1986/11/05
- Source: Source: Proc. 1st eur. Symp. Air Cond. Refrig., Brussels
211-217; 1 fig. - Document available for consultation in the library of the IIR headquarters only.
Indexing
-
METOP: energy efficient office building.
- Author(s) : LAINE J., SAARI M.
- Date : 1992/09
- Languages : English
View record
-
NEW INDUSTRIAL BUILDING: A VIEW TO SAVINGS.
- Author(s) : WANG J.
- Date : 1989
- Languages : English
- Source: ASHRAE Journal - vol. 31 - n. 7
View record
-
PROBE 13: Charities Aid Foundation.
- Date : 1998/02
- Languages : English
- Source: Build. Serv. J. - vol. 20 - n. 2
View record
-
STUDIES IN COMMERCIAL ENERGY RETROFIT.
- Author(s) : GRUMMAN D. L.
- Date : 1988/03
- Languages : English
- Source: Heat. Pip. Air Cond. - vol. 60 - n. 3
View record
-
Air conditioning and energy efficient buildings...
- Author(s) : FIELD A.
- Date : 1992/06
- Languages : English
- Source: CADDET Energy Effic. Newsl. - n. 2
View record