PRODUCTION OF HOT WATER AT 323 AND 353 K (50 AND 80 DEG C) BY HEAT PUMP IN SERIES USING R22 AND R142B, WITH HEAT RECOVERY FROM THE COOLING WATER OF MILLING-MACHINES, IN THE CHOCOLATE INDUSTRY.

PRODUCTION D'EAU CHAUDE A 323 ET 353 K (50 ET 80 DEG C) PAR POMPE A CHALEUR EN SERIE FONCTIONNANT AU R22 ET AU R142B EN RECUPERATION SUR L'EAU DE REFROIDISSEMENT DE BROYEURS EN CHOCOLATERIE.

Author(s) : BARRAILH G.

Summary

DESCRIPTION OF THE COMBINED UNITS PROVIDING HEATING AND COOLING IN A CHOCOLATE FACTORY. THE REQUIREMENTS FOR COLD (WATER COOLING, IN A CLOSED CIRCUIT, OF THE CYLINDERS USED FOR MILLING THE SUGAR-COCOA-MILK-BUTTER MIXTURE) AND THE REQUIREMENTS FOR HEAT (STORAGE AND PUMPING OF PASTE, CLEANING, REWARMING OF THE REFINING MACHINES, OF THE MELTING MACHINES, ETC) USING 2 HOT WATER CIRCUITS AT 323 AND 353 K (50 AND 80 DEG C) ARE ANALYZED. A HEAT PUMP (USING R22) MEETS THE REQUIREMENTS FOR COLD AT 288 K (15 DEG C) AND THE REQUIREMENTS FOR HEAT OF THE CIRCUIT AT 323 K, WHEREAS A SECOND HEAT PUMP (USING R142B), WHOSE CONDENSER IS FITTED IN SERIES WITH THAT OF THE FIRST PUMP, SATISFIES THE REQUIREMENTS FOR HEAT IN THE CIRCUIT AT 353 K. A DIAGRAM SHOWING THE REQUIREMENTS, THE SCHEMATIC DIAGRAM OF THE INSTALLATION AND THE OPERATIONAL SAVINGS DUE TO THE USE OF HEAT PUMPS ARE GIVEN. J.R.

Details

  • Original title: PRODUCTION D'EAU CHAUDE A 323 ET 353 K (50 ET 80 DEG C) PAR POMPE A CHALEUR EN SERIE FONCTIONNANT AU R22 ET AU R142B EN RECUPERATION SUR L'EAU DE REFROIDISSEMENT DE BROYEURS EN CHOCOLATERIE.
  • Record ID : 1990-0802
  • Languages: French
  • Publication date: 1989/06/20
  • Source: Source: CFE, Colloq., Lyon
    12 p.; 4 fig.; 1 phot.